Phone: (907) 349-0680 terry@alaskaconcretetech.com Send Email
2005 - ACT shipped super bags, mixer truck, and concrete pump by barge to Atka Island which is a long way out on the Aleutians, and batched 150 yards of concrete for a hydro-electric plant.